{"id":74,"date":"2026-10-07T14:05:58","date_gmt":"2026-10-07T14:05:58","guid":{"rendered":"https:\/\/agileop.africa\/blog\/?p=74"},"modified":"2026-10-07T14:05:58","modified_gmt":"2026-10-07T14:05:58","slug":"inventory-buffer-planning-african-supply-chains","status":"publish","type":"post","link":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/","title":{"rendered":"Inventory Buffers Are a Decision, Not a Guess: A Practical Test for African Supply Chains"},"content":{"rendered":"<p>Inventory is often discussed as a number of days on hand. That can hide the real engineering question: which uncertainty is the buffer meant to absorb, and where should it sit? For African operations with variable import, transport and supplier lead times, a blanket increase in stock ties up cash while leaving critical items exposed.<\/p>\n<figure><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/agileop.africa\/blog\/wp-content\/uploads\/2026\/10\/warehouse-stock-review-african-professional.jpg\" alt=\"Black woman checking inventory records in a warehouse aisle\" width=\"1125\" height=\"750\" style=\"display:block;width:100%;max-width:640px;height:auto;margin:0 auto;\"><figcaption>Warehouse stock review. Photo: <a href=\"https:\/\/www.pexels.com\/photo\/woman-wearing-grey-uniform-in-warehouse-7018655\/\">cottonbro studio \/ Pexels<\/a>.<\/figcaption><\/figure>\n<h2>Separate demand from replenishment risk<\/h2>\n<p>Start with one product family. Record weekly demand, actual order-to-receipt lead times and the causes of delay. A nominal supplier lead time is not the same as the distribution of real arrivals. If a port hand-off, payment release or internal approval adds unpredictable days, the buffer calculation must reflect that variation.<\/p>\n<p>Set a service target by business consequence. A low-value component that stops an entire production line deserves different treatment from a slow-moving substitute. Use a reorder point built from expected demand during lead time plus a safety allowance for observed variability. Test the result against past stockouts and excess stock, rather than treating a formula as proof.<\/p>\n<h2>Place the buffer where it protects flow<\/h2>\n<p>More inventory at every site can multiply working capital without improving customer service. Ask whether pooled stock at a regional hub, supplier-held inventory, a second source or a shorter approval path would give better protection. MIT supply-chain research found that supply lead-time variation drove high safety-stock values in two studied products; reducing the underlying variation was a practical lever for lowering buffers.<\/p>\n<p>This is a systems decision. A local purchasing team rewarded only for unit price may choose large, infrequent orders, while operations absorbs the resulting shortages and storage burden. Make the trade-off visible across procurement, finance, warehousing and customer service. Our earlier <a href=\"https:\/\/agileop.africa\/blog\/supply-chain-control-tower-africa\/\">supply-chain control-tower guide<\/a> shows how to give those teams one view of exceptions and ownership.<\/p>\n<figure><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/agileop.africa\/blog\/wp-content\/uploads\/2026\/10\/warehouse-shipment-review-black-professional.jpg\" alt=\"Black professional managing cartons and shipments in a warehouse\" width=\"473\" height=\"750\" style=\"display:block;width:100%;max-width:420px;height:auto;margin:0 auto;\"><figcaption>Shipment review in a warehouse. Photo: <a href=\"https:\/\/www.pexels.com\/photo\/a-wman-in-white-shirt-is-standing-near-the-shelves-with-carton-boxes-6169636\/\">Tima Miroshnichenko \/ Pexels<\/a>.<\/figcaption><\/figure>\n<h2>Run a measured six-week test<\/h2>\n<p>Choose 20 to 30 items with a mix of criticality and demand patterns. Establish baseline fill rate, stockout days, expediting cost and inventory value. Change one policy at a time, assign an owner for exceptions and review actual arrivals weekly. Compare service and cash together before expanding the policy.<\/p>\n<p>When the same shortage returns despite higher stock, investigate the feedback loop rather than ordering more. The <a href=\"https:\/\/agileop.africa\/blog\/systems-thinking-recurring-operational-problems-africa\/\">systems-thinking guide on recurring fixes<\/a> offers a way to trace those unintended consequences. The aim is reliable flow with the smallest justified buffer, supported by better supplier and internal decisions.<\/p>\n<p><small>Research context: <a href=\"https:\/\/ctl.mit.edu\/publications\/continuous-multi-echelon-inventory-optimization\">MIT Center for Transportation and Logistics, 2020<\/a>.<\/small><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A practical six-week test for setting inventory buffers around real demand, lead-time variation, service risk and working-capital trade-offs in African operations.<\/p>\n","protected":false},"author":1,"featured_media":72,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"default","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":"","rank_math_title":"Inventory Buffer Planning for African Supply Chains | Agile Ops","rank_math_description":"Set inventory buffers using real lead-time variation, service risk and working-capital trade-offs. A practical six-week test for African supply chains.","rank_math_focus_keyword":"inventory buffer planning Africa","_aioseop_title":"","_aioseop_description":""},"categories":[28],"tags":[7,4,10,12],"class_list":["post-74","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-supply-chain-operations","tag-africa","tag-industrial-engineering","tag-supply-chain-management","tag-supply-chain-resilience"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Inventory Buffer Planning for African Supply Chains | Agile Ops<\/title>\n<meta name=\"description\" content=\"Set inventory buffers using real lead-time variation, service risk and working-capital trade-offs. A practical six-week test for African supply chains.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Inventory Buffer Planning for African Supply Chains | Agile Ops\" \/>\n<meta property=\"og:description\" content=\"Set inventory buffers using real lead-time variation, service risk and working-capital trade-offs. A practical six-week test for African supply chains.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/\" \/>\n<meta property=\"og:site_name\" content=\"Agile Ops Insights\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-07T14:05:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/agileop.africa\/blog\/wp-content\/uploads\/2026\/10\/warehouse-stock-review-african-professional.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1125\" \/>\n\t<meta property=\"og:image:height\" content=\"750\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Takudzwa Stephene Kamba\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Takudzwa Stephene Kamba\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/\"},\"author\":{\"name\":\"Takudzwa Stephene Kamba\",\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/#\\\/schema\\\/person\\\/5c7719ec9ff6208124628bf2fecf8c27\"},\"headline\":\"Inventory Buffers Are a Decision, Not a Guess: A Practical Test for African Supply Chains\",\"datePublished\":\"2026-10-07T14:05:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/\"},\"wordCount\":431,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/warehouse-stock-review-african-professional.jpg\",\"keywords\":[\"Africa\",\"Industrial Engineering\",\"Supply Chain Management\",\"Supply Chain Resilience\"],\"articleSection\":[\"Supply Chain &amp; Operations\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/\",\"url\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/\",\"name\":\"Inventory Buffer Planning for African Supply Chains | Agile Ops\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/warehouse-stock-review-african-professional.jpg\",\"datePublished\":\"2026-10-07T14:05:58+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/#\\\/schema\\\/person\\\/5c7719ec9ff6208124628bf2fecf8c27\"},\"description\":\"Set inventory buffers using real lead-time variation, service risk and working-capital trade-offs. A practical six-week test for African supply chains.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/#primaryimage\",\"url\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/warehouse-stock-review-african-professional.jpg\",\"contentUrl\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/warehouse-stock-review-african-professional.jpg\",\"width\":1125,\"height\":750,\"caption\":\"Black woman checking inventory records in a warehouse aisle\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/inventory-buffer-planning-african-supply-chains\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Inventory Buffers Are a Decision, Not a Guess: A Practical Test for African Supply Chains\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/\",\"name\":\"Agile Ops Insights\",\"description\":\"Practical Industrial Engineering and Technology Insights for Africa\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/#\\\/schema\\\/person\\\/5c7719ec9ff6208124628bf2fecf8c27\",\"name\":\"Takudzwa Stephene Kamba\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/37fbf6bff94a1e658bedee2cacda8db124f66004bfe0a110df51181b1e19e57d?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/37fbf6bff94a1e658bedee2cacda8db124f66004bfe0a110df51181b1e19e57d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/37fbf6bff94a1e658bedee2cacda8db124f66004bfe0a110df51181b1e19e57d?s=96&d=mm&r=g\",\"caption\":\"Takudzwa Stephene Kamba\"},\"sameAs\":[\"https:\\\/\\\/agileop.africa\\\/blog\"],\"url\":\"https:\\\/\\\/agileop.africa\\\/blog\\\/author\\\/skamba\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Inventory Buffer Planning for African Supply Chains | Agile Ops","description":"Set inventory buffers using real lead-time variation, service risk and working-capital trade-offs. A practical six-week test for African supply chains.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/","og_locale":"en_US","og_type":"article","og_title":"Inventory Buffer Planning for African Supply Chains | Agile Ops","og_description":"Set inventory buffers using real lead-time variation, service risk and working-capital trade-offs. A practical six-week test for African supply chains.","og_url":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/","og_site_name":"Agile Ops Insights","article_published_time":"2026-10-07T14:05:58+00:00","og_image":[{"width":1125,"height":750,"url":"https:\/\/agileop.africa\/blog\/wp-content\/uploads\/2026\/10\/warehouse-stock-review-african-professional.jpg","type":"image\/jpeg"}],"author":"Takudzwa Stephene Kamba","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Takudzwa Stephene Kamba","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/#article","isPartOf":{"@id":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/"},"author":{"name":"Takudzwa Stephene Kamba","@id":"https:\/\/agileop.africa\/blog\/#\/schema\/person\/5c7719ec9ff6208124628bf2fecf8c27"},"headline":"Inventory Buffers Are a Decision, Not a Guess: A Practical Test for African Supply Chains","datePublished":"2026-10-07T14:05:58+00:00","mainEntityOfPage":{"@id":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/"},"wordCount":431,"commentCount":0,"image":{"@id":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/#primaryimage"},"thumbnailUrl":"https:\/\/agileop.africa\/blog\/wp-content\/uploads\/2026\/10\/warehouse-stock-review-african-professional.jpg","keywords":["Africa","Industrial Engineering","Supply Chain Management","Supply Chain Resilience"],"articleSection":["Supply Chain &amp; Operations"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/","url":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/","name":"Inventory Buffer Planning for African Supply Chains | Agile Ops","isPartOf":{"@id":"https:\/\/agileop.africa\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/#primaryimage"},"image":{"@id":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/#primaryimage"},"thumbnailUrl":"https:\/\/agileop.africa\/blog\/wp-content\/uploads\/2026\/10\/warehouse-stock-review-african-professional.jpg","datePublished":"2026-10-07T14:05:58+00:00","author":{"@id":"https:\/\/agileop.africa\/blog\/#\/schema\/person\/5c7719ec9ff6208124628bf2fecf8c27"},"description":"Set inventory buffers using real lead-time variation, service risk and working-capital trade-offs. A practical six-week test for African supply chains.","breadcrumb":{"@id":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/#primaryimage","url":"https:\/\/agileop.africa\/blog\/wp-content\/uploads\/2026\/10\/warehouse-stock-review-african-professional.jpg","contentUrl":"https:\/\/agileop.africa\/blog\/wp-content\/uploads\/2026\/10\/warehouse-stock-review-african-professional.jpg","width":1125,"height":750,"caption":"Black woman checking inventory records in a warehouse aisle"},{"@type":"BreadcrumbList","@id":"https:\/\/agileop.africa\/blog\/inventory-buffer-planning-african-supply-chains\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/agileop.africa\/blog\/"},{"@type":"ListItem","position":2,"name":"Inventory Buffers Are a Decision, Not a Guess: A Practical Test for African Supply Chains"}]},{"@type":"WebSite","@id":"https:\/\/agileop.africa\/blog\/#website","url":"https:\/\/agileop.africa\/blog\/","name":"Agile Ops Insights","description":"Practical Industrial Engineering and Technology Insights for Africa","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/agileop.africa\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/agileop.africa\/blog\/#\/schema\/person\/5c7719ec9ff6208124628bf2fecf8c27","name":"Takudzwa Stephene Kamba","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/37fbf6bff94a1e658bedee2cacda8db124f66004bfe0a110df51181b1e19e57d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/37fbf6bff94a1e658bedee2cacda8db124f66004bfe0a110df51181b1e19e57d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/37fbf6bff94a1e658bedee2cacda8db124f66004bfe0a110df51181b1e19e57d?s=96&d=mm&r=g","caption":"Takudzwa Stephene Kamba"},"sameAs":["https:\/\/agileop.africa\/blog"],"url":"https:\/\/agileop.africa\/blog\/author\/skamba\/"}]}},"_links":{"self":[{"href":"https:\/\/agileop.africa\/blog\/wp-json\/wp\/v2\/posts\/74","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/agileop.africa\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/agileop.africa\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/agileop.africa\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/agileop.africa\/blog\/wp-json\/wp\/v2\/comments?post=74"}],"version-history":[{"count":1,"href":"https:\/\/agileop.africa\/blog\/wp-json\/wp\/v2\/posts\/74\/revisions"}],"predecessor-version":[{"id":75,"href":"https:\/\/agileop.africa\/blog\/wp-json\/wp\/v2\/posts\/74\/revisions\/75"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/agileop.africa\/blog\/wp-json\/wp\/v2\/media\/72"}],"wp:attachment":[{"href":"https:\/\/agileop.africa\/blog\/wp-json\/wp\/v2\/media?parent=74"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/agileop.africa\/blog\/wp-json\/wp\/v2\/categories?post=74"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/agileop.africa\/blog\/wp-json\/wp\/v2\/tags?post=74"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}